Lehi Solar Installation Process

From initial quote to system activation, Lehi's solar installation process is designed for efficiency and clarity. Understand each step, local permitting with the City of Lehi Community Development Department, and Rocky Mountain Power's interconnection requirements for a seamless transition to solar power.

Get Lehi Solar Quotes
⚙️
Streamlined Process
Clear 6-step timeline
📋
Local Expertise
Lehi-specific permits & rules
Guided Support
Expert help at every stage
Solar panels installation

Step-by-Step Lehi Solar Installation Timeline

Going solar in Lehi follows a clear, predictable path. Here are the six key steps from your initial consultation to powering your home with clean energy:

1

Consultation & Site Assessment

Duration: 1-2 days

Activity: Energy analysis, roof evaluation, shading study

Lehi Specific: Snow load analysis, altitude considerations

Output: Custom system design & proposal

2

Design & Permitting

Duration: 2-3 weeks

Activity: Engineering plans, City of Lehi permit application

Lehi Specific: Submission to Community Development Department

Output: Approved building & electrical permits

3

Equipment Procurement

Duration: 1-2 weeks

Activity: Order panels, inverters, mounting hardware

Lehi Specific: Selection of snow-shedding compatible equipment

Output: All equipment delivered to your home

4

Physical Installation

Duration: 2-4 days

Activity: Roof mounting, electrical wiring, inverter setup

Lehi Specific: Adherence to Utah's snow load building codes

Output: Fully installed solar system

5

Inspections & Approvals

Duration: 1-2 weeks

Activity: City electrical inspection, Rocky Mountain Power review

Lehi Specific: City inspector visit, RMP interconnection approval

Output: Permission to Operate (PTO) from Rocky Mountain Power

6

System Activation & Monitoring

Duration: 1 day

Activity: Final system commissioning, app setup

Lehi Specific: Rocky Mountain Power net metering activation

Output: Live solar production & immediate savings

Get Lehi Solar Quotes

Lehi Solar Permit Process Details

All solar installations in Lehi require permits from the City of Lehi Community Development Department. Here's what you need to know:

🏛️

City of Lehi Community Development

Permit Type: Residential Solar Photovoltaic System Permit

Application Method: Online via Lehi Citizen Access Portal

Typical Fee: $400 - $700 (based on system size)

Required Documents: Site plan, electrical diagram, structural calculations for snow load

Contact: Building Division: (385) 201-1005

📄

Lehi-Specific Requirements

Snow Load Calculation: Required - 60 psf minimum for Lehi

Altitude Considerations: Equipment rated for 4,500+ ft elevation

Historic Districts: Additional review if applicable

Setback Requirements: Compliance with Lehi zoning ordinances

Wind Load: Designed for 90 mph winds

Streamlined Solar Permitting

Eligibility: Standard residential systems under 25 kW

Process: Pre-approved plans for common Utah roof types

Timeline: Permit issuance in 5-7 business days

Requirement: Installer must be Utah licensed solar contractor

Benefit: Faster approval, predictable timeline

Get Lehi Solar Quotes

Lehi City Inspection Requirements

After installation, your solar system must pass multiple inspections before receiving Permission to Operate (PTO) from Rocky Mountain Power:

🔍

Electrical Rough-In Inspection

Timing: After wiring, before wall/ceiling closure

Inspector: City of Lehi Electrical Inspector

Focus: Wiring methods, grounding, junction boxes

Code: National Electrical Code (NEC) + Utah amendments

Result: Green tag if approved

🏠

Final Electrical Inspection

Timing: After full system installation

Inspector: City of Lehi Electrical Inspector

Focus: Complete system safety, labeling, disconnect switches

Critical Check: Rapid shutdown compliance (NEC 690.12)

Result: Final approval for electrical work

☀️

Rocky Mountain Power Interconnection Inspection

Timing: After City electrical approval

Reviewer: Rocky Mountain Power Solar Program Specialist

Focus: Net metering equipment, production meter

Requirement: Must use RMP-approved bi-directional meter

Result: Permission to Operate (PTO) letter

Lehi Inspection Tip:

Schedule your City electrical inspection through the Lehi Citizen Access Portal. Most inspections can be scheduled within 2-3 business days. Your solar installer typically handles all inspection scheduling and coordination.

Get Lehi Solar Quotes

Rocky Mountain Power Connection Process

Rocky Mountain Power has specific requirements for connecting your solar system to the grid. Following their process ensures smooth net metering activation:

📝

Interconnection Application

Form: Rocky Mountain Power Schedule 135 Application

Timing: Submit with permit application

Requirements: System specifications, single-line diagram

Fee: $100 application fee (residential)

Approval Time: 15-20 business days

🔌

Equipment Requirements

Meter: Rocky Mountain Power provides bi-directional meter

Inverter: Must be UL 1741 SA compliant

Disconnect: Visible, accessible AC disconnect required

Labeling: Specific warning labels per RMP standards

Monitoring: Production meter data accessible to RMP

💡

Net Metering Program

Program: Schedule 135 Net Metering

Rate: Full retail credit for excess generation

Benefit: Monthly rollover of credits

Annual True-Up: Settlement each April

System Limit: 25 kW maximum for residential

Get Free Lehi Solar Quotes

Lehi Solar: Timeline from Quote to Activation

Understanding the complete timeline helps set proper expectations for your Lehi solar project. Here's the typical schedule from start to finish:

📅

Complete Lehi Solar Project Timeline

W1

Weeks 1-2: Consultation & Design

Activities: Site assessment, energy analysis, proposal review

Decision Point: Sign contract, select equipment

W3-5

Weeks 3-5: Permitting & Planning

Activities: Engineering plans, City of Lehi permit submission, RMP application

Key Milestone: Permit approval from Community Development

W6

Week 6: Installation

Activities: Equipment delivery, roof mounting, electrical work

Duration: Typically 2-4 days of active work

W7-8

Weeks 7-8: Inspections & Approval

Activities: City electrical inspections, Rocky Mountain Power review

Key Milestone: Permission to Operate from RMP

W9

Week 9: Activation & Monitoring

Activities: System commissioning, app setup, monitoring activation

Result: Solar production begins, savings start immediately

Total Typical Timeline: 8-10 Weeks from Contract to Activation
Get Free Lehi Solar Quotes
🗺️

Explore More Utah Solar Information

Looking for solar information in other Utah cities or statewide programs?

View all Utah Solar Information